2,500 Solar Panels Installed at Ferryspeed’s Portsmouth Site

To strengthen our commitment to sustainability, we’ve recently installed more than 2,500 solar panels across our Portsmouth site.

This investment means that we are contributing clean energy into the community and building a more environmentally responsible future for our business.

With an export capacity of nearly one megawatt, we can now supply enough energy to:
– power the lighting in 2,000 homes
– charge 20 EVs simultaneously
– offset more than 300 tonnes of CO₂ annually (based on typical UK solar carbon savings).

Untitled design (48)